Gain-scheduled PID

A PID whose gains are looked up from where the process is. You linearize at a few operating points, tune each one, and interpolate between them. The standard fix when a process's gain changes across its range.

Theory

If the plant near operating point ρ\rho behaves like Gρ(s)G_\rho(s), tune a controller Cρ(s)C_\rho(s) for each one, then let the gains follow a scheduling variable that tracks the operating point:

Kc(ρ), Ti(ρ), Td(ρ)interpolated between breakpoints ρ1<ρ2<…K_c(\rho),\ T_i(\rho),\ T_d(\rho) \quad\text{interpolated between breakpoints } \rho_1 < \rho_2 < \dots

The "frozen" assumption. Each local design assumes the gains stay put long enough for the loop to behave like its linear model. That requires the scheduling variable to change slowly compared with the closed-loop dynamics.

Choosing the variable.

  • Schedule on PV when the nonlinearity lives in the process state (level in a cone).
  • Schedule on SP when you want the gains to move ahead of the process on setpoint changes.
  • Schedule on an external measurement (throughput, production rate) when that is what moves the dynamics.

Scheduling on PV closes an extra loop through the gains: fast PV swings make the gains swing too.

When it works, and when it breaks

Works
  • Gain or time constants that change smoothly and predictably with a measurable variable.

  • Plants you can bump-test at several operating points but have no formula for.

  • A known operating schedule (throughput levels, product grades).

Breaks
  • Scheduling variables that move as fast as the loop itself: the frozen assumption fails.

  • Too few breakpoints over a strong nonlinearity: the interpolation is wrong in between.

  • Gain changes that bump the output (the integral is not kept in output units).

  • Maintenance: every breakpoint is a set of numbers someone has to understand and retune.

How to tune it

  1. Choose 3–5 operating points across the range, more where the gain changes fastest.
  2. Bump test (or linearize) at each one and tune with the same rule and the same closed-loop speed, so the loop behaves the same everywhere.
  3. Check the margins between breakpoints too, not just at them.
  4. Run setpoint steps that cross breakpoints, and confirm there is no bump when the gains change.
The tuning rules in the lab
SIMC (Skogestad) (PI, PID)
Kc=τK(τc+θ),Ti=min⁡(τ, 4(τc+θ))K_c = \frac{\tau}{K(\tau_c + \theta)},\quad T_i = \min\big(\tau,\ 4(\tau_c + \theta)\big)

Model-based, one tuning knob: the closed-loop time constant τc. τc = θ gives a fast, still robust loop (Ms ≈ 1.6); larger τc is smoother. The min() on Ti keeps lag-dominant and integrating processes from responding too slowly to load upsets. PID uses the second-order model: Td = τ2 in series form.

Lambda (IMC) (PI)
Kc=τK(λ+θ),Ti=τK_c = \frac{\tau}{K(\lambda + \theta)},\quad T_i = \tau

The process-industry favourite: choose λ, the closed-loop time constant, and the setpoint response is first-order with no overshoot. Ti = τ cancels the process pole, which makes load rejection slow on lag-dominant processes. λ = 1–3 × τ is typical for robustness.

IMC-PID (Rivera–Morari–Skogestad) (PI, PID)
Kc=2τ+θ2Kλ,Ti=τ+θ2PID: Kc=2τ+θK(2λ+θ), Td=τθ2τ+θK_c = \frac{2\tau + \theta}{2K\lambda},\quad T_i = \tau + \frac{\theta}{2}\qquad\text{PID: } K_c = \frac{2\tau + \theta}{K(2\lambda + \theta)},\ T_d = \frac{\tau\theta}{2\tau + \theta}

Internal model control worked back into a PID (Rivera, Morari and Skogestad, 1986): the controller that makes the loop a first-order λ response, with the dead time replaced by its first-order Padé approximation. That approximation is what gives the derivative, and why Ti = τ + θ/2 rather than τ. Keep λ above about 0.8θ for the PID and 1.7θ for the PI, where the approximation stops holding. Like Lambda, it cancels the process lag, so load upsets on lag-dominant processes recover slowly. The IMC structure itself (the model running beside the plant) is the Smith predictor on the bench.

Lambda for integrating (averaging level) (P, PI)
Kc=2λ+θk′(λ+θ)2,Ti=2λ+θK_c = \frac{2\lambda + \theta}{k'(\lambda + \theta)^2},\quad T_i = 2\lambda + \theta

For integrating processes such as levels, from the ramp rate k′ (% of span per second, per % of output). λ is the arrest time: how long the level keeps moving after an inflow upset. For a step upset Δ (in % of output) the level swings about k′·Δ·λ/e before it turns round, so choose λ from the room the tank has. A long λ lets the tank absorb the upset and keeps the outflow smooth: averaging level control. P-only: Kc = 1/(k′λ), which leaves an offset that is harmless in a buffer.

Ziegler–Nichols (reaction curve) (P, PI, PID)
Kc=0.9 τKθ,Ti=3.33 θK_c = \frac{0.9\,\tau}{K\theta},\quad T_i = 3.33\,\theta

The 1942 rules, aiming for a quarter-amplitude decay. Aggressive: Ms is often above 2, so the loop rings and is sensitive to model error. Worth knowing because so many loops in the field were tuned this way.

Cohen–Coon (P, PI, PID)
Kc=τKθ(0.9+θ12τ),Ti=θ 30+3θ/τ9+20θ/τK_c = \frac{\tau}{K\theta}\Big(0.9 + \frac{\theta}{12\tau}\Big),\quad T_i = \theta\,\frac{30 + 3\theta/\tau}{9 + 20\theta/\tau}

Like Ziegler–Nichols but corrected for dead time, so it copes better when θ/τ is large. Also aimed at quarter-amplitude decay, so also aggressive.

AMIGO (Åström–Hägglund) (PI, PID)
Kc=0.15K+(0.35−θτ(θ+τ)2)τKθ,Ti=0.35θ+13θτ2τ2+12θτ+7θ2K_c = \frac{0.15}{K} + \Big(0.35 - \frac{\theta\tau}{(\theta+\tau)^2}\Big)\frac{\tau}{K\theta},\quad T_i = 0.35\theta + \frac{13\theta\tau^2}{\tau^2 + 12\theta\tau + 7\theta^2}

Derived by optimizing load rejection with a robustness limit (Ms ≈ 1.4) over a large test batch of processes. A safe modern default when you have no reason to choose a speed.

How to implement it

  • Interpolate linearly, and hold the end values flat outside the table.
  • Keep the PID's integral in output units so a gain change doesn't move the output.
  • Optionally rate-limit the scheduled gains.
  • Log the active gains with the trend: it's the first thing you need when someone asks why the loop did something.

Siemens and elsewhere

Siemens
  • Lookup: an FC interpolating over breakpoints (exported as LL_Schedule) writes Gain, Ti and Td into the PID instance every cycle.
  • With PID_Compact: write Retain.CtrlParams, and test bumplessness on your firmware.
  • With the custom LL_PID: the integral is already in output units, so gain changes don't bump.
  • Sharing: store the breakpoints in a DB so they can be edited from the HMI by authorised users.
Elsewhere

Many DCS PID blocks have built-in gain scheduling, or "adaptive gain" tables keyed on an external variable. Flight control systems are the textbook case: schedules on dynamic pressure and Mach number.

Interactive Controller Sandbox

Test and tune Gain-scheduled PID live on a process, benchmark against baseline PI, and inspect the resulting code.

Interactive Gains (Primary Loop)

Drag sliders or nudge gains to observe the closed-loop transient response
Kc (gain): 3
Ti (integral): 245 s
Td (derivative): 0 s

Closed-Loop Response: Gain scheduling vs Baseline PI

Simulating…
Running test scenarios…
Block Diagram
SP rΣ+−PID (scheduled)Kc·(1 + 1/Ti·s + Td·s)PIDGain tableon PVKcCV uValve1/(τᵥs + 1), char.stemΣ++d: outlet valve openingProcessA(h)·ḣ = Qᵢₙ − QₒᵤₜPV yTransmittere^(−θs)/(τₘs + 1)Σ++noise nPV measured
Generated code
// Loop Lab export: Conical tank level, LIC-201
// TIA Portal SCL (S7-1200 / S7-1500). Generated code: review before use on a real plant.

FUNCTION "LL_Schedule" : Void
{ S7_Optimized_Access := 'TRUE' }
VERSION : 0.1
   VAR_INPUT
      X : Real;           // scheduling variable
   END_VAR
   VAR_OUTPUT
      Gain : Real;
      Ti : Real;
      Td : Real;
   END_VAR
   VAR_TEMP
      w : Real;
   END_VAR

BEGIN
    // Linear interpolation between the breakpoints, held flat outside them.
    IF #X <= 0.4 THEN
        #Gain := 3.0;
        #Ti := 245.0;
        #Td := 0.0;
    ELSIF #X <= 1.0 THEN
        #w := (#X - 0.4) / 0.6;
        #Gain := 3.0 + #w * (3.0 - 3.0);
        #Ti := 245.0 + #w * (245.0 - 245.0);
        #Td := 0.0 + #w * (0.0 - 0.0);
    ELSIF #X <= 1.6 THEN
        #w := (#X - 1.0) / 0.6;
        #Gain := 3.0 + #w * (3.0 - 3.0);
        #Ti := 245.0 + #w * (245.0 - 245.0);
        #Td := 0.0 + #w * (0.0 - 0.0);
    ELSE
        #Gain := 3.0;
        #Ti := 245.0;
        #Td := 0.0;
    END_IF;
END_FUNCTION

FUNCTION_BLOCK "LL_PID"
{ S7_Optimized_Access := 'TRUE' }
VERSION : 0.1
   VAR_INPUT
      Setpoint : Real;        // engineering units
      Input : Real;           // measurement, engineering units
      ManualEnable : Bool;    // TRUE = manual: Output follows ManualValue
      ManualValue : Real;     // %
      Feedforward : Real;     // %, added to the output (0 when unused)
      HoldIntegral : Int;     // +1 / -1: don't integrate up / down (a cascade slave is saturated)
      ExtResetEnable : Bool;  // override: this controller is not selected, so its integral follows ExtReset
      ExtReset : Real;        // %, the selected (valve) output, for external reset feedback
      Cycle : Real := 0.5;    // s, must match the cyclic interrupt the block is called from
   END_VAR
   VAR_OUTPUT
      Output : Real;          // %
      AtLimit : Int;          // +1 / -1 when the output is pinned high / low
   END_VAR
   VAR
      Gain : Real := 3.0;        // % output per % of span
      Ti : Real := 245.0;          // s, 0 = no integral action
      Td : Real := 0.0;          // s, 0 = no derivative action
      PWeighting : Real := 1.0;   // setpoint weight b on P
      DWeighting : Real := 0.0;   // setpoint weight c on D
      TdFiltRatio : Real := 0.1;  // derivative filter = TdFiltRatio * Td
      InLow : Real := 0.0;
      InHigh : Real := 2.0;
      OutLow : Real := 0.0;
      OutHigh : Real := 100.0;
      Invert : Bool := FALSE;
      Integral : Real;        // integral term, in % output (so gain changes don't bump)
      DTerm : Real;
      LastED : Real;
   END_VAR
   VAR_TEMP
      sp : Real;
      pv : Real;
      dir : Real;
      e : Real;
      eP : Real;
      eD : Real;
      p : Real;
      tf : Real;
      iNext : Real;
      v : Real;
      u : Real;
   END_VAR

BEGIN
    // Scale to % of span: the gains are then independent of engineering units.
    #sp := (#Setpoint - #InLow) / (#InHigh - #InLow) * 100.0;
    #pv := (#Input - #InLow) / (#InHigh - #InLow) * 100.0;
    #dir := 1.0;
    IF #Invert THEN
        #dir := -1.0;
    END_IF;
    #e := #dir * (#sp - #pv);
    #eP := #dir * (#PWeighting * #sp - #pv);
    #eD := #dir * (#DWeighting * #sp - #pv);
    #p := #Gain * #eP;

    IF #ManualEnable THEN
        // Track: preload the integral so switching to auto doesn't bump the output.
        #u := LIMIT(MN := #OutLow, IN := #ManualValue, MX := #OutHigh);
        #Integral := #u - #p - #Feedforward;
        #DTerm := 0.0;
        #LastED := #eD;
        #Output := #u;
        #AtLimit := 0;
        RETURN;
    END_IF;

    // Derivative on c*SP - PV through a first-order filter (backward Euler).
    IF #Td > 0.0 THEN
        #tf := MAX(IN1 := #TdFiltRatio * #Td, IN2 := 1.0E-6);
        #DTerm := #tf / (#tf + #Cycle) * #DTerm
                  + #Gain * #Td / (#tf + #Cycle) * (#eD - #LastED);
    ELSE
        #DTerm := 0.0;
    END_IF;
    #LastED := #eD;

    IF #ExtResetEnable AND #Ti > 0.0 THEN
        // External reset feedback: the integral follows the selected output through a Ti lag,
        // so this controller's output is the valve signal plus its own P and D.
        #iNext := #Integral + #Cycle / MAX(IN1 := #Ti, IN2 := #Cycle) * (#ExtReset - #Integral);
    ELSIF #Ti > 0.0 THEN
        #iNext := #Integral + #Gain * #Cycle / #Ti * #e;
    ELSE
        #iNext := #Integral;
    END_IF;

    #v := #p + #iNext + #DTerm + #Feedforward;
    #u := LIMIT(MN := #OutLow, IN := #v, MX := #OutHigh);

    // A saturated slave asks its master to stop integrating in that direction.
    IF #ExtResetEnable THEN
        #Integral := #iNext;
    ELSIF #Ti > 0.0 AND NOT ((#HoldIntegral > 0 AND #iNext > #Integral) OR (#HoldIntegral < 0 AND #iNext < #Integral)) THEN
        // Conditional integration: stop integrating while the output is pinned and the error pushes it further.
        IF NOT ((#v > #OutHigh AND #iNext > #Integral) OR (#v < #OutLow AND #iNext < #Integral)) THEN
            #Integral := #iNext;
        END_IF;
    END_IF;

    IF #v > #OutHigh THEN
        #AtLimit := 1;
    ELSIF #v < #OutLow THEN
        #AtLimit := -1;
    ELSE
        #AtLimit := 0;
    END_IF;
    #Output := #u;
END_FUNCTION_BLOCK

// OB30 "Cyclic interrupt", cycle time 0.5 s (500 ms).
// "LT-201" is the scaled input (NORM_X/SCALE_X from the analog card), "LV-201" the output to scale back to 0-27648.
// Look up the gains for where the process is now, then run the PID with them.
"LL_Schedule"(X := "LT-201", Gain => "LIC_201_DB".Gain, Ti => "LIC_201_DB".Ti, Td => "LIC_201_DB".Td);
"LIC_201_DB"(Setpoint := "SP", Input := "LT-201", ManualEnable := "Manual", ManualValue := "ManualOut");
"LV-201" := "LIC_201_DB".Output;