On-off with hysteresis
15 compatible plantsFully on below the setpoint, off above it.
From the simplest thing that could work to multi-variable model predictive control. Climb only as far as the process and performance requirements demand.
Fully on below the setpoint, off above it.
Proportional, integral and derivative action: the default.
A PID whose gains change with the operating point.
A PID on a straightened-out measurement or output.
A PID plus action on measured disturbances, before they arrive.
A fast inner loop inside the main one.
A PID that sees a prediction of the measurement, with the dead time taken out.
A normal controller and a limit controller on one valve; the higher (or lower) output wins.
The controlled flow follows the wild flow at a set ratio, trimmed by the main measurement.
Every state of the plant, estimated by an observer from the measurements, fed back with its own gain.
A PID on each variable, each with its own valve, and optionally a decoupler between them.
Plans both valves a few moves ahead from a model, within their limits, and re-plans every cycle.
A PI that keeps fitting a model to what it measures and retunes itself from it.
An observer estimates everything acting on the PV besides the output, and the law cancels it.
Write the controller yourself, in Structured Text, and run it on the bench.