Blending: ratio control
Production sets the diluent flow, and the product must stay at 10 % whatever it does. Feedback, feedforward, or ratio, and why does it matter which?
The situation
A 50 % concentrate is dosed into a diluent stream to make a 10 % product. The diluent flow (FT-801) is set upstream and swings with production, from 25 to 60 m³/h. An analyzer reads the product 20 s downstream.
The mechanical view shows the key fact. At a fixed concentrate flow the product moves with every rate change. At a fixed ratio, it doesn't move at all.
Feedback only
A PI from the analyzer to the concentrate valve (, s).
Every production change is a 2–5 %-point upset on the product (11–27 % of the span): off spec for four to six minutes, because the analyzer only sees it 25 s later. A concentrate flow loop underneath (cascade) changes nothing here: the upset doesn't pass through the concentrate flow.
Fixed ratio
Let FIC-802 follow the diluent: setpoint = 0.25 × FT-801. No analyzer in the loop at all.
Result. Production changes now barely touch the product: under 2.5 % of span, settled within about a minute.
But a weaker concentrate delivery (45 % instead of 50) leaves the product 1 %-point low for good, because nothing measures it. Grade changes are impossible without someone retyping the ratio.
Ratio with an analyzer trim
Let AIC-803 set the ratio (0–0.5) from the analyzer. Tune the flow loop first, then the trim on a step in (, s).
Result.
- Production changes stay under 1 % of span.
- A new concentrate strength is found and corrected by the trim, as fast as feedback alone could.
- Total IAE drops from 321 to 118.
Why not additive feedforward?
Feedforward from FT-801 to the valve (1 % per m³/h, designed from the model) handles production changes almost as well as ratio. The difference shows when the plant runs away from the design rate.
- At 40 % rate, the feedforward loop's trim sees a process gain three times higher: grade changes overshoot 28–32 %. The ratio trim overshoots 10–13 %.
- At 160 % rate, the feedforward trim is too slow to settle in seven minutes. The ratio trim settles in under five.
- On the mismatch test, ratio's IAE is a third of feedforward's.
Ratio keeps the trim's gain constant. What still changes with rate is the mixing time (, 96 s at low rate against 22 s at high), which no structure can remove.
Verdict
Ratio control with a quality trim.
- When the product depends on a proportion and the throughput is set elsewhere, hold the proportion.
- Use the analyzer to correct the proportion, not the flow.
- Limit the ratio range, cut off at low wild flow, and hold the ratio when the analyzer faults.