Conical tank level

A point-down conical tank. The cross-section grows several times from bottom to top, so the process gain and speed change across the range: one PI tuning cannot be right everywhere.

Plant Dynamics at Nominal Point

FOPDT dynamics & controllability regime
Open on the bench🧩 Build in Block Studio
Dead time θ3.75 snothing happens for this long after the valve moves
Time constant τ1250 sthen 63 % of the way in this long
Gain K2% of span the PV moves per % of valve
Lag-dominant (θ/τ < 0.2) — Easy for PIDelay share: 0.3% (θ/τ = 0.003)
0% Pure lag (fast PI)50% Balanced100% Pure delay (needs Smith / MPC)
Linearized model at 1 m:
G(s)≈2 e−3.75s1250s+1G(s) \approx \frac{2\,e^{-3.75s}}{1250s + 1}
Verdict: PID falls short

Characterize if you know the geometry; gain-schedule if you don't; or accept one PI tuned for the top. Controlling volume gives one PI tuning that is right from bottom to top, costs a single function block, and survives moderate geometry errors. Gain scheduling reaches the same result from bump tests at a few levels, without needing a formula, at the cost of more parameters to look after. What both buy is margin more than error: they hold Ms at about 1.5 at every level. A single PI tuned fast enough for the top comes within about 10 % on error, but runs at Ms 1.8 near the bottom, with seven times the gain it needs there. The PI to avoid is the one tuned at the bottom: sluggish, then ringing, higher up.